
Tunisair Technics
Construction & installation of 02 fire protection water storage tanks along with PPR pipes and valves connection (2013)


Client
Tunisair Technics
Completed works
- Construction & installation of 02 fire protection water storage tanks along with PPR pipes and valves connection (2013)
Photo gallery(2 photos)
Other references

6 photosTRAPSA
Refurbishment of storage tank by replacement of tank bottoms (tank S10 of TRAPSA, capacity 35 000 m³, 2014)
See the reference
2 photosMARETAP
Refurbishment, including bottom change, of storage bins
See the reference
8 photosSTIR
Rehabilitation of the hydrocarbon storage tank 11S52: replacement of the upper shell of the tank
See the reference