
STIR
Rehabilitation of the hydrocarbon storage tank 11S52: replacement of the upper shell of the tank


Client
STIR
Completed works
- Rehabilitation of the hydrocarbon storage tank 11S52: replacement of the upper shell of the tank
- Rehabilitation of tank 11S52: construction of a new bottom according to API 650 and 653
- Supply and installation of the dome and floating screen of the hydrocarbon storage tank 11S52 at STIR Bizerte (2017)
Photo gallery(8 photos)
Other references

6 photosTRAPSA
Refurbishment of storage tank by replacement of tank bottoms (tank S10 of TRAPSA, capacity 35 000 m³, 2014)
See the reference
2 photosMARETAP
Refurbishment, including bottom change, of storage bins
See the reference
2 photosTunisair Technics
Construction & installation of 02 fire protection water storage tanks along with PPR pipes and valves connection (2013)
See the reference